AI Engineers
Menu

Employee Login

  • About Us
    • President's Message
    • Firm History
    • Corporate Team
    • Faces of AI
      • Christmas Party
  • Services
    • Bridge Engineering
      • Overview
      • Inspection & Evaluation
        • ConnDOT Bridge Inspections
        • RIDOT Bridge Inspections
        • NYSDOT Region 8
        • MassDOT NBIS Inspections
        • VDOT Safety Inspections
        • MassDOT CA/T Structure Inspection
        • MBTA Bridge Inspections and Load Ratings
      • Ancillary Structures
        • ConnDOT Overhead Sign Inspections
        • VDOT Traffic Device Inspections
        • NYSDOT Region 8 Sign Inspections
        • MassDOT Field Inspection and NDT of Highway Sign, ITS Inspection
      • Bridge Design
        • Crown Street
        • Old Wheeler Lane Bridge
        • ConnDOT List 22-25 Bridge Design
        • NYCDDC Porpoise Bridge
        • NYSDOT Gowanus Expressway
        • Smithfield Bridge
      • Load Rating
        • ConnDOT Load Rating
        • VDOT Load Rating
        • RIDOT Load Rating
        • MassDOT Load Rating
        • NYSDOT Region 11 Load Rating
    • Construction Services
      • Overview
      • Construction Management
        • UConn PMO
        • CTDS Construction Management
        • Department of Veterans' Affairs Construction Management Services
        • NYCDDC Horizon Juvenile Center
      • Construction Inspection
        • CTfastrak
        • Waterbury Bus Storage and Maintenance Facility
        • W.A.T.E.R. Project
        • Pugsley Creek Sewer and Water Main
        • New Haven Rail Line Substations
        • Reconstruction of I-84
    • Civil Engineering
      • Overview
      • Site Design
        • Journalism and New Media High School
        • Asian Studies Academy
        • Metro-North New Haven Rail Yard Improvements
        • Restoration of Union Railroad Station
        • Dept. of VA Perimeter Fence
      • Highway & Roadway Design
        • ConnDOT U.S. Route 1 Operational Lanes Highway Design
        • MassDOT Route 5 Highway Design
        • Green Manor South Subdivision
        • Park & Taylor Road
        • NYSDOT Design of Park Avenue Viaduct
      • Land Surveying
        • ConnDOT I-84 Topographic Survey
        • ConnDOT Reconstruction of Moses Wheeler Bridge
        • ConnDOT On-Call Survey
        • ConnDOT West River Bridge Replacement
        • RIDOT On-Call Survey
      • Airports
        • Bradley Sewer Study
        • LaGuardia International Airport Airside Utility Design
        • Bradley Viaduct
      • Utilities/Power
        • Replacement of 2 Chillers at 61 Woodland Street
        • ConnDOT Metro-North Rail Yard Maintenance of Way (MOW) Facility
        • Red Horse Hill Road Drainage Improvements
        • Greater Hartford Central Connecticut Reliability Project
        • Stony Hill Substation Access Road
      • Transportation & Traffic Engineering
        • ConnDOT I-95 Interchange Exit 33
        • MassDOT Route 28
        • Sikorsky Traffic Improvement Study
        • ConnDOT U.S. Route 1 Operational Lanes
        • ConnDOT U.S. Route 1 Signal Design
      • Water & Wastewater
        • MDC Capitol Avenue Sewer Replacement
        • MDC Maple Avenue Sewer Rehabilitation & Replacement
        • ConnDOT Metro-North Component Change-Out (CCO) Shop
        • Dept. of VA Sewer System Rehabilitation & Replacement
    • Building Systems Engineering
      • Overview
      • MEP - Building Systems
        • Department of Veterans Affairs IDIQ
        • CTDCS MEP
        • Metro-North New Haven Rail Yard Improvements
        • Renovation of Manuel Lujan Building
        • VA Dietetic Kitchen
        • P.T. Barnum Railroad Station
      • Structural Engineering
        • Hartford Hospital On-Call
        • VA Seismic Study
        • CT DCS Structural
        • SUNY Upstate Medical Center, Weiskotten Hall
        • High Speed Ferry Terminal
      • Sustainable Design
        • Renovation of Manuel Lujan Building
        • VA Dietetic Kitchen
        • CTDCS 61 Woodland Street
    • Design-Build Services
      • Overview
      • Tappan Zee Bridge
      • Brooklyn Bridge
      • VA Benefits Section
      • MTA Henry Hudson Bridge Rehabilitation
      • Colonial Road Bridge Replacement & Pocket Track Extension
      • Buckram Road Bridge Replacement
  • Media
    • AI News
    • Print & Publications
      • AI Outlook Volume 12 No. 1 - 2017
      • AI Outlook Volume 12 No. 2 - 2017
      • Digital Download May-June 2017: Issue 2
      • Digital Download January-February 2018 : Issue 1
  • Employment
  • Contact Us
  • Overview
  • Site Design
    • Journalism and New Media High School
    • Asian Studies Academy
    • Metro-North New Haven Rail Yard Improvements
    • Restoration of Union Railroad Station
    • Dept. of VA Perimeter Fence
  • Highway & Roadway Design
    • ConnDOT U.S. Route 1 Operational Lanes Highway Design
    • MassDOT Route 5 Highway Design
    • Green Manor South Subdivision
    • Park & Taylor Road
    • NYSDOT Design of Park Avenue Viaduct
  • Land Surveying
    • ConnDOT I-84 Topographic Survey
    • ConnDOT Reconstruction of Moses Wheeler Bridge
    • ConnDOT On-Call Survey
    • ConnDOT West River Bridge Replacement
    • RIDOT On-Call Survey
  • Airports
    • Bradley Sewer Study
    • LaGuardia International Airport Airside Utility Design
    • Bradley Viaduct
  • Utilities/Power
    • Replacement of 2 Chillers at 61 Woodland Street
    • ConnDOT Metro-North Rail Yard Maintenance of Way (MOW) Facility
    • Red Horse Hill Road Drainage Improvements
    • Greater Hartford Central Connecticut Reliability Project
    • Stony Hill Substation Access Road
  • Transportation & Traffic Engineering
    • ConnDOT I-95 Interchange Exit 33
    • MassDOT Route 28
    • Sikorsky Traffic Improvement Study
    • ConnDOT U.S. Route 1 Operational Lanes
    • ConnDOT U.S. Route 1 Signal Design
  • Water & Wastewater
    • MDC Capitol Avenue Sewer Replacement
    • MDC Maple Avenue Sewer Rehabilitation & Replacement
    • ConnDOT Metro-North Component Change-Out (CCO) Shop
    • Dept. of VA Sewer System Rehabilitation & Replacement
Home » Services » Civil Engineering » Highway & Roadway Design » Green Manor South Subdivision

Green Manor South Subdivision

« Back

Green Manor South Subdivision

ENFIELD, CT

AI designed road replacements for the Green Manor South subdivision. The project included full-depth reconstruction of approximately 2,100 lf and Full-Depth Reclamation with Cement (FDR-C) of approximately 4,200 lf of roadway. The design also included geometric realignments to provide for new snow shelves/greenbelts, and new sidewalks. AI also provided design services for the replacement of the roadway's closed catch basin system, which included the best management practices of deep sumps and pipe outlet hoods.

The roads were reconstructed due to their low Pavement Condition Index (PCI) ratings, and to correct problematic geometric and drainage deficiencies. Columbia Road, Troy Lane and Flag Court were constructed in the late 1950's while Northfield Road was constructed in the mid 1970's. All of the streets provided access to single family residential homes.

 

 

 

Duration

2012 - Present

 

Salient Features
  • Roadway widening/ resurfacing
  • Traffic signal & interchange design improvements
  • Survey/Right-of-Way
  • Drainage design
  • Environmental coordination

Toll-Free 866-635-7740

Contact Us

Office Locations:     Middletown, CT     |     New York, NY     |     Albany, NY     |     Boston, MA     |     Cranston, RI     |     Richmond, VA

© 2018 AI Engineers Inc. All Rights Reserved.

Powered by SoSimpleCMS