AI Engineers
Menu

Employee Login

  • About Us
    • President's Message
    • Firm History
    • Corporate Team
    • Faces of AI
      • Christmas Party
  • Services
    • Bridge Engineering
      • Overview
      • Inspection & Evaluation
        • ConnDOT Bridge Inspections
        • RIDOT Bridge Inspections
        • NYSDOT Region 8
        • MassDOT NBIS Inspections
        • VDOT Safety Inspections
        • MassDOT CA/T Structure Inspection
        • MBTA Bridge Inspections and Load Ratings
      • Ancillary Structures
        • ConnDOT Overhead Sign Inspections
        • VDOT Traffic Device Inspections
        • NYSDOT Region 8 Sign Inspections
        • MassDOT Field Inspection and NDT of Highway Sign, ITS Inspection
      • Bridge Design
        • Crown Street
        • Old Wheeler Lane Bridge
        • ConnDOT List 22-25 Bridge Design
        • NYCDDC Porpoise Bridge
        • NYSDOT Gowanus Expressway
        • Smithfield Bridge
      • Load Rating
        • ConnDOT Load Rating
        • VDOT Load Rating
        • RIDOT Load Rating
        • MassDOT Load Rating
        • NYSDOT Region 11 Load Rating
    • Construction Services
      • Overview
      • Construction Management
        • UConn PMO
        • CTDS Construction Management
        • Department of Veterans' Affairs Construction Management Services
        • NYCDDC Horizon Juvenile Center
      • Construction Inspection
        • CTfastrak
        • Waterbury Bus Storage and Maintenance Facility
        • W.A.T.E.R. Project
        • Pugsley Creek Sewer and Water Main
        • New Haven Rail Line Substations
        • Reconstruction of I-84
    • Civil Engineering
      • Overview
      • Site Design
        • Journalism and New Media High School
        • Asian Studies Academy
        • Metro-North New Haven Rail Yard Improvements
        • Restoration of Union Railroad Station
        • Dept. of VA Perimeter Fence
      • Highway & Roadway Design
        • ConnDOT U.S. Route 1 Operational Lanes Highway Design
        • MassDOT Route 5 Highway Design
        • Green Manor South Subdivision
        • Park & Taylor Road
        • NYSDOT Design of Park Avenue Viaduct
      • Land Surveying
        • ConnDOT I-84 Topographic Survey
        • ConnDOT Reconstruction of Moses Wheeler Bridge
        • ConnDOT On-Call Survey
        • ConnDOT West River Bridge Replacement
        • RIDOT On-Call Survey
      • Airports
        • Bradley Sewer Study
        • LaGuardia International Airport Airside Utility Design
        • Bradley Viaduct
      • Utilities/Power
        • Replacement of 2 Chillers at 61 Woodland Street
        • ConnDOT Metro-North Rail Yard Maintenance of Way (MOW) Facility
        • Red Horse Hill Road Drainage Improvements
        • Greater Hartford Central Connecticut Reliability Project
        • Stony Hill Substation Access Road
      • Transportation & Traffic Engineering
        • ConnDOT I-95 Interchange Exit 33
        • MassDOT Route 28
        • Sikorsky Traffic Improvement Study
        • ConnDOT U.S. Route 1 Operational Lanes
        • ConnDOT U.S. Route 1 Signal Design
      • Water & Wastewater
        • MDC Capitol Avenue Sewer Replacement
        • MDC Maple Avenue Sewer Rehabilitation & Replacement
        • ConnDOT Metro-North Component Change-Out (CCO) Shop
        • Dept. of VA Sewer System Rehabilitation & Replacement
    • Building Systems Engineering
      • Overview
      • MEP - Building Systems
        • Department of Veterans Affairs IDIQ
        • CTDCS MEP
        • Metro-North New Haven Rail Yard Improvements
        • Renovation of Manuel Lujan Building
        • VA Dietetic Kitchen
        • P.T. Barnum Railroad Station
      • Structural Engineering
        • Hartford Hospital On-Call
        • VA Seismic Study
        • CT DCS Structural
        • SUNY Upstate Medical Center, Weiskotten Hall
        • High Speed Ferry Terminal
      • Sustainable Design
        • Renovation of Manuel Lujan Building
        • VA Dietetic Kitchen
        • CTDCS 61 Woodland Street
    • Design-Build Services
      • Overview
      • Tappan Zee Bridge
      • Brooklyn Bridge
      • VA Benefits Section
      • MTA Henry Hudson Bridge Rehabilitation
      • Colonial Road Bridge Replacement & Pocket Track Extension
      • Buckram Road Bridge Replacement
  • Media
    • AI News
    • Print & Publications
      • AI Outlook Volume 12 No. 1 - 2017
      • AI Outlook Volume 12 No. 2 - 2017
      • Digital Download May-June 2017: Issue 2
      • Digital Download January-February 2018 : Issue 1
  • Employment
  • Contact Us
  • Overview
  • Site Design
    • Journalism and New Media High School
    • Asian Studies Academy
    • Metro-North New Haven Rail Yard Improvements
    • Restoration of Union Railroad Station
    • Dept. of VA Perimeter Fence
  • Highway & Roadway Design
    • ConnDOT U.S. Route 1 Operational Lanes Highway Design
    • MassDOT Route 5 Highway Design
    • Green Manor South Subdivision
    • Park & Taylor Road
    • NYSDOT Design of Park Avenue Viaduct
  • Land Surveying
    • ConnDOT I-84 Topographic Survey
    • ConnDOT Reconstruction of Moses Wheeler Bridge
    • ConnDOT On-Call Survey
    • ConnDOT West River Bridge Replacement
    • RIDOT On-Call Survey
  • Airports
    • Bradley Sewer Study
    • LaGuardia International Airport Airside Utility Design
    • Bradley Viaduct
  • Utilities/Power
    • Replacement of 2 Chillers at 61 Woodland Street
    • ConnDOT Metro-North Rail Yard Maintenance of Way (MOW) Facility
    • Red Horse Hill Road Drainage Improvements
    • Greater Hartford Central Connecticut Reliability Project
    • Stony Hill Substation Access Road
  • Transportation & Traffic Engineering
    • ConnDOT I-95 Interchange Exit 33
    • MassDOT Route 28
    • Sikorsky Traffic Improvement Study
    • ConnDOT U.S. Route 1 Operational Lanes
    • ConnDOT U.S. Route 1 Signal Design
  • Water & Wastewater
    • MDC Capitol Avenue Sewer Replacement
    • MDC Maple Avenue Sewer Rehabilitation & Replacement
    • ConnDOT Metro-North Component Change-Out (CCO) Shop
    • Dept. of VA Sewer System Rehabilitation & Replacement
Home » Services » Civil Engineering » Airports » Bradley Viaduct

Bradley Viaduct

« Back

Design of Viaduct Bradley International Airport

windsor locks, CT

AI was assigned to prepare structural design, plans, specifications, and construction estimate for this viaduct at the Bradley International Airport. The design encompassed the extension of the existing substructure of the viaduct to serve the expansion of Terminal ‘A’ at the Airport. The new viaduct has an overall length of 537 ft. and out to out width of 76 ft. with up to 42 inch dia. columns.  The substructure design consisted of the analysis and design of new multi-column piers, abutment and wingwalls on special footings.  The substructure was designed to accommodate the surcharge loads of the adjacent existing and expanded building. Temporary shoring of existing foundation was designed. Single mode seismic analysis was used to design the substructure. AI coordinated the design with the prime consultant to optimize overall cost savings and to reduce the effects of the construction on the traveling public and airport operations. 

 

Duration

2003 - 2005

 

Salient Features
  • New Substructure Design
  • Seismic Design
  • Staged Construction/ Traffic Controls
  • Accommodated Adjacent Building Loads

Toll-Free 866-635-7740

Contact Us

Office Locations:     Middletown, CT     |     New York, NY     |     Albany, NY     |     Boston, MA     |     Cranston, RI     |     Richmond, VA

© 2018 AI Engineers Inc. All Rights Reserved.

Powered by SoSimpleCMS