Town of Enfield Park Street and Taylor Road Reconstruction

Enfield, CT

AI provided survey and design services for the full-depth reconstruction and pavement resurfacing of Park Street and Taylor Road in Enfield, CT. The roads were being reconstructed due to their poor condition and to correct problematic geometric and drainage deficiencies. The project was designed with AutoCAD Civil 3D, and full cost estimates, quantities, specifications, and supporting bid documents are also included. Sustainable best management practices were implemented for this project including the design of grassed swales for water quality treatment, and infiltration areas for groundwater recharge. Additional best management practices included new catch basins with deep sumps and pipe hoods, to settle solids, and prevent floatable debris from discharging from the system. Additionally, plunge pools were designed at culvert crossing inlets to provide for settlement of particles. AI also prepared a stormwater pollution prevention plan for the site, and obtained the permit, on behalf of the Town, from the Connecticut Department of Energy and Environmental Protection (CTDEEP)

Highlights 

  • Duration: 2015 - 2016
  • Project Scope:
    • Pavement Improvements
    • Drainage Improvements
    • Use of Safety Edge
    • Topographic Survey